Products
heater & reformer components

Efficient manufacturing procedure followed at the shop aid fast production of heater & reformer components that are ready for installation at site. These components can be shipped with pre-applied insulation/refractory reducing the site activity to the minimum.

No.
Description
Client
Inspection Agency
 
1 Four sets of Twin-Cylinder CDU Heater Packages for Reliance JERP Project - Jamnagar  Heurtey Petrochem Heurtey, Reliance, Bureau Veritas 900
2 Heater Components for Reliance JERP Project   Heurtey Petrochem Heurtey, Reliance, Bureau Veritas 230
3 NHT/CCR Heater Package for BPCL - Kochi Refinery  Technip KTI Technip, Bureau Veritas 800
4 Reformer Package for IOCL - Barauni Refinery   Linde
Engineering
Linde, Bureau Veritas 500
5 Radiant Casings for XXXX Heaters at MRPL Refinery  Thermax Limited Thermax, Technimont  
6 Reformer Package for Hydrogen  Reformer at HPCL - Vizag  Technip KTI Technip, TUV 163
7 Heater Package for DCU Heaters at MRPL - Mangalore.  Technip KTI Technip, CEIL 213
8 Reformer Package for Primary Reformer Unit at NFL - Nangal  ITT SpA ITT, Bureau Veritas, PDIL 800

 

special structures

Spetech has been manufacturing and supplying several special purpose equipments based on the customer requirements. The product range encompasses a variety of equipments of various shapes and dimensions for diverse applications. Complete structural solution for any application is another area of our expertise. Engineering, Manufacturing and installation of structures of any magnitude can be taken up at Spetech.

EQUIPMENTS
No.
Description
Client
Inspection Agency
1 Blower Feed Inlet Silencers  Praxair India Praxair India
2 Vacum Discharge Silencers  Praxair India Praxair India
3 Auxiliary Vacum Discharge Silencers  Praxair India Praxair India
4 Collector Pot Technip KTI HSB
5 Tubular Wind Mill Towers Suzlon Energy Tata Projects
6 Water Cooled Ducts & Panels for EAF Essar Steel ESSAR
7 FCCU  Reactor Ring Beam  Reliance Industries Lloyds, Bechtel
8 Plant Stack for Alkylation Unit Reliance Industries Lloyds, Bechtel
9 Vent Stack for HGU Plant Linde Enginnering Bureau Veritas
10 Air Pre Heater components for KRIBHCO GEA Ecoflex GEA
11 Vent Stack for SRU Incinerator Package Callidus Technologies Bureau Veritas, EIL
12 Fabrication of CS Pipes Reliance, Essar  Reliance, Essar 


STRUCTURES
No.
Description
Client
Inspection Agency
Weight
1 Fabrication of Platform for Reliance - Jamnagar Reliance Real   
2 Fabrication of Conductor Protector for Gauri Offshore Platforms Cairn India Germanischer Lloyds  
3 Fabrication of Crane Girders for 1100MW CCPP - Torrent Power Plant, Sugen Shapoorji Palonji Siemens  
4 Power Plant Structurals including Detailed Engg for 1100MW CCPP Torrent Power Project - Sugen Siemens India Siemens 920
5 DRI Steel Structures for Gulf Sponge Iron Company Electrotherm  Bureau Veritas  
6 FCCU Platforms, Wheeler Trolleys and Cyclones Saddles for Annual Turnaround Shut Down of Reliance - Jamnagar Reliance Reliance, Bechtel  
7 Fabrication of HDT Reactor Skirts for L&T Larsen & Toubro Larsen & Toubro  
8 Structural Fabrication for 350 MW Combined Cycle Power Plant at Utran JMC Projects, Alstom Power  Alstom 520
9 Pipe rack Structures, Pipings, Ducts  & platforms for SRU Incinerator Package at BPCL - Kochi Refinery Callidus Technologies  Bureau Veritas, EIL  
10 Steel Structures for SRU Unit at BPCL - Kochi Refinery  Neo Structo Construction  Bureau Veritas  
11 Structural fabrication for Essar HYTEMP Pump House  Essar ESSAR Heavy Engg. Services 1750
12 Fabrication of Curved Beams of different sections for Monorail at Adani's West Port - Mundra  PMC Projects  PMC Projects